From Design, Trial to Mass Production of Capacitor and PC Board, We will supply Electronic Device all over the world



Design

  1. 1.High quality design taking advantage of mass production know-how.
    • Design specifications are optimized taking both quality and cost into consideration.
  2. 2.Total service including cost studies and VA suggestions in the design stage.
    • Research into the most efficient sizes that minimize waste.
  3. 3.Simulations in the design stage (reducing the number of evaluation cycles based on prototypes).
    • Impedance control
    • Simulations of heat and noise

Prototyping

  1. 1.Rapid Response
    • We provide rapid prototyping with the same quality level as the production units.
  2. 2.Mass Production Verification
    • Suggestions for corrections to mass production problem areas while yet in the prototyping stage.
    • VA suggestions for mass production.

(CAD Room)

Schedule

  Double sided TH 4 layers 4BVH 6 layers 6BVH 8 layers 8BVH Laser Process
1-Layer-Build 2-Layer-Build
Quick 1 3days 3days 5days 4days 6days 4days 6days 6days 8days
Quick 2 2days 2days 4days 3days 5days 3days 5days 5days 6days
Quick 3 1.5days 1.5days 3days 2days 4days 2days 4days 4days 5days
Quick 4 1day 1day 2.5days 1day 3days 1.5days 3.5days - -

(The standard production volume is about 20 sheets)

Options

DRC (design rule check) 1 day
Electrical check (flying checker-compatible) 1 day
Impedance measurements 1 day
Plating with other metals (for example, gold flash) 2 day

Inquire with your sales representative separately regarding build-up processes.

Required Materials

  • Circuit board specifications
  • Dimensions (outside dimensions, hole diameters)
  • File structure diagram and aperture list)
  • Gerber data (including data on outside dimensions)
  • NC data

Method by which to Receive Data

  • FTP server/client
  • MILINE95 Ver 2 (MILINE2 compatible)
  • E-Mail address
  • X File3/2

(Design room)